Capability
Set cost targets while the design is still flexible
A target cost is established at concept stage, while changes are still cheap, rather than discovered only once a design is locked.
- Target costs established at concept stage based on process and material assumptions.
- Design decisions tracked against the target as the part matures.
- Drift flagged early, when changes are still inexpensive.